Friday 04 September:
Door frames are in place for downstairs bath, stairs to 2nd floor, stairs to garage.
Some ceiling rafters are up in garage.
Picked up wood for kitchen/dining room job - 3 weeks away, so we have time to come up with the pieces that haven't arrived yet. Installation quote was a mess, lots of errors/overcharges.
Asked Bob to quote change to back stairs - TREX surfaces instead of PTL, so we match with the back deck (with maybe an eye to connecting eventually?).
Friday 04 September:
Ceiling rafters are up over garage, hallway and bathroom.
Hallway and bathroom walls are completely framed.
0 Comments:
Post a Comment
<< Home